Home / English / Lender monitoring Deutsch

Construction progress reports for lenders in Germany: independent monitoring before each drawdown

Many banks release the next tranche only when an independent progress report is available. We inspect the site, determine the percentage of completion per trade, reconcile it with the payment plan and invoices and deliver a report with photos that the lender can review.

Discuss my project +49 178 604 1571
Summary

A construction progress report (Bautenstandsbericht) documents for the financing bank how far a construction project is actually complete at a reference date. It is the lender's technical basis for releasing the next drawdown. Schneider Theißing prepares these reports through civil engineers: site inspection, completion per trade, photo documentation, reconciliation with payment plan and invoices, and notes on defects and risks. In international transactions this role is often called lender's technical advisor or project monitor during the construction phase.

  • One-off or for each drawdown
  • Report with photos, list of trades and traceable weighting
  • Independent of designers and contractors
  • Proposal per project; inspection date by arrangement

When you need a progress report

In construction finance the bank does not pay out the loan in one sum but according to construction progress. Before each tranche it wants to know whether the work paid for has actually been done. For developer finance and larger projects it often requires a report by an independent engineer.

Delays often arise at the same point: the report cannot be reviewed. Percentages without weighting, photos without reference, invoices without reconciliation. We deliver the report so that the bank can review it with as few queries as possible, and we tell you beforehand which documents we need.

  • The bank requires a progress report before payout
  • The architect does not issue a progress confirmation
  • The developer reports progress you cannot verify
  • The bank returned the last report with queries
  • Invoices and progress do not match
  • You need the report at short notice

Request a progress report

The request is non-binding. Fees arise only with a written proposal that you accept. Your data is used solely to process your request.

Key facts

  • What you receive Progress report with percentage of completion per trade, photo documentation, reconciliation with payment plan and invoices, defects and risks.
  • Who it is for Banks and lenders, developers, investors and owners with construction finance.
  • Where Frankfurt Rhine-Main, Bergstraße and Rhine-Neckar; registered office in Zwingenberg between Darmstadt, Mannheim and Heidelberg; Germany by project.
  • Who reviews Civil engineers from the management team, independent of designers and contractors. Contacts are the managing directors Moritz Schneider and Christoph Theißing.
  • Language Report in German or English; site communication in German.
  • Fees Proposal based on project size, reporting cycle and depth of review, in writing before appointment.

Working for the lender

You appoint us, we report to you. On the same project we do not work for the developer at the same time. For several financings we agree report structure, fee per report and contacts once. After that you call off each project by email, without a new proposal round. We agree the structure of the first report with your credit department; all follow-up reports have the same structure and weighting.

For ongoing monitoring over the whole construction period see our German page Projektcontrolling für Banken. For data center projects, lender monitoring is part of data center construction management.

What the progress report contains

Inspection and photos

Site inspection at the reference date, photo documentation per trade and building element, with reference to drawings and bill of quantities.

Percentage of completion

Completion per trade, weighted by cost share, and overall completion in percent with a traceable derivation.

Payment plan and invoices

Reconciliation with payment plan, interim invoices and tranches already paid out; notes where payment and performance diverge.

Defects and risks

Visible defects, open work, schedule risks and cost risks relevant to the lender.

Drawdown recommendation

A clear statement whether the requested drawdown is covered by the construction progress from a technical point of view.

Follow-up reports

For several drawdowns the same structure and weighting, so that the lender can compare the progress over time.

Bautenstandsbericht, Bautenstandsbestätigung, MaBV: what is what

A Bautenstandsbestätigung is usually a short bank form in which a site manager or engineer confirms that a certain construction stage has been reached. A Bautenstandsbericht goes further: it supports the percentage of completion with photos, weighting and reconciliation with invoices and names the risks. Which form the bank requires is stated in the loan agreement or in the bank's letter.

When residential property is bought from a developer, the German Real Estate Agent and Developer Ordinance (Makler- und Bauträgerverordnung, MaBV, section 3) sets the instalments in which the buyer pays. The buyer can have an independent engineer check whether a construction stage has been reached before releasing the instalment. We do that as well.

  • Bautenstandsbestätigung: bank form, stage reached yes or no
  • Bautenstandsbericht: percentage of completion, photos, invoice reconciliation, risks
  • MaBV instalment check: check of the construction stage before an instalment is paid to the developer
  • Project controlling for banks: ongoing reports over the whole construction period

What the report does not do

The report records the visible construction progress at the reference date. It does not confirm that the work is free of defects, does not examine concealed building elements, structural stability or the permit situation, and does not replace a valuation. Whether an instalment is legally due is assessed by the contracting parties and their lawyers.

Frequently asked questions

The bank decides whom it accepts. As a rule this is an independent engineer who is not involved in the project as designer or contractor. If in doubt, ask your bank beforehand; we are happy to agree form and content directly with the bank.
They depend on project size, number of trades, reporting cycle and depth of review. You receive a written proposal before appointment. For several drawdowns we state the fee for each follow-up report at the same time.
We agree the date of the site inspection after your request. If the bank has set a deadline, please state it in your request.
Payment plan or drawdown schedule, construction contract or bill of quantities, current interim invoices, drawings and, if available, earlier reports and the letter from the bank.
Either can appoint us, but on one project we do not work for the bank and for the developer at the same time. If the bank appoints us, we report to the bank.
Yes. Before each instalment under the MaBV we check whether the construction stage has been reached and whether there are visible defects, so that you do not pay for work that is still missing. Whether an instalment is legally due is assessed by your lawyer.

Who you work with

Moritz Schneider Managing Director, civil engineer (M.Eng.), Master of Arts in construction law and construction management

Christoph Theißing Managing Director, civil engineer (B.Eng.), Master of Science in real estate (EBS Universität), MBA (Korea University)

Experience supporting Industrial halls, building construction, refurbishment and new build, multi-storey residential, logistics, data centers, fibre network rollout (FTTH)

How we work On construction projects we act for the owner only. Both managing directors work on each mandate themselves, together with our team. Scope and fee are set out in a written proposal before work starts.

Qualifications and working method (German)

Progress report for your lender

Describe the project, the stage and the deadline. You receive a proposal and a date for the site inspection.

Send a request Written proposal on request
Call
Progress report for the lender
Send a request